You are currently viewing

SKU nosku821 Category Tag

Fibre-Metal by Honeywell SE2 Sensor Type II Side Impact Hard Hats have a advanced suspension system with 8 load bearing points.  Should an impact occur, SuperEight impact energy control system dissipates force by reducing and spreading it over a larger area.  The Fibre-Metal SE2 Type II Side Impact Hard Hat has a patented attenuator band that provides periphery protection should a lateral impact occur.  In addition, the smooth crown, air-flow design provides air circulation for user comfort.

CALL FOR PRICE

CALL FOR PRICE

Fibre-Metal SE2 Type II Side Impact Hard Hat, SE201A000

Fibre-Metal by Honeywell SE2 Sensor Type II Side Impact Hard Hats have a advanced suspension system with 8 load bearing points.  Should an impact occur, SuperEight impact energy control system dissipates force by reducing and spreading it over a larger area.  The Fibre-Metal SE2 Type II Side Impact Hard Hat has a patented attenuator band that provides periphery protection should a lateral impact occur.  In addition, the smooth crown, air-flow design provides air circulation for user comfort.

Description

  • Meets ANSIZ89.1 Type 2, Class E and CSAZ94.1 Type 2, Class E

Additional information

Weight2 lbs
CSV Number

Height

Lift

Manufacturer

Material

Node

Quote Only?

Specifications

Width

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Customer Login

MENU

Product out of stock? Have a specific question about a product? Contact us below

Request A Quote

MENU

Contact Us

Contact Us

  • MM slash DD slash YYYY
  • Please use the form below to contact us.
    Please check the appropriate box to ensure we can properly respond to your inquiry.

OUR PRODUCTS

Please Fill out our online application

Application For Credit

  • MM slash DD slash YYYY
  • Company Information
    If Yes, attach certificate
  • Accepted file types: pdf, docx, doc, Max. file size: 256 MB.
  • Trade References - All three references required for processing
  • Reference One
  • Reference Two
  • Reference Three
  • All accounts are COD until a credit application has been completed, reviewed, and approved. Upon credit approval, Applicant agrees to payment terms of NET 30 DAYS unless otherwise agreed upon. Any past due invoice is subject to a charge of 1 1/2% per month (18% annual rate); plus all costs of collection, including but not limited to attorney fees if collection becomes necessary. I hereby certify that the information contained herein is complete and accurate. This information has been furnished with the understanding that it is to be used to determine the amount and conditions of the credit to be extended. Furthermore, I hereby authorize the financial institution listed in this credit application to release necessary information to the company for which credit is being applied for in order to verify the information contained herein.
    By checking this box, you agree to submit this credit application.